Note: This is festive season in India.  2nd (Thursday), 3rd  (Friday) and 6th of October (Monday) are public holidays and the 4th & 5th being Saturday and Sunday.  We should expect heavy rush after the long week end.

We will take all approvals and instructions from our counterparts on 29th and 30th September itself.

MUMBAI – Sea
NHAVA SHEVA- Sea Export

  • JNPT: Normal
  • NSICT: The terminal is operating normally.
  • GTI:  Normal
  • Congestion situation improved but still prevailing at Singapore, Port Klang and Colombo.

NHAVA SHEVA- Sea Import

  • Huge Congestion at port and Containers taking 20-25 Days to rail out for import shipments.
  • Shipping lines are charging port congestion charges on import shipments due to congestion at Nhava Sheva for inbound.

MUMBAI- Air

  • Situation normal in Mumbai.
  • MK is overbooked till 1st October so we are providing EK options as well for Plaisance (MRU).

DELHI – Sea Export

  • AT ICD Loni: Pendency of 5-6 days for railing to NHAVA
  • SHEVA / Mumbai and Mundra Port.
  • ICD FARIDABAD: Currently Rail movement are normal.
  • CFS PATPARGANJ: Currently Rail movement are normal.
  • ICD DADRI: Currently Rail movement are normal.
  • ICD: TUGHLAKABAD (TKD): Pendency of 2-3 days for railing to Mumbai port/
  • Nhava Sheva.
  • TKD Port Authority no allowed more than 80 carting in a day

Delhi -Sea Import

  • From PIPAVA: Huge Congestion at port – Containers are taking min 20-25 days to rail out for import shipments. Containers are railed out from Pipava on double Decker train and at CMLK the train off loads the upper containers and leaves with the below containers only.  The offloaded containers take another 2 to 3 days to arrive at New Delhi.
  • From MUNDRA: Huge Congestion at port  and Containers taking 12-15 Days to rail out for import shipments.

DELHI – Air

  • Airport Situation Normal at this point in time Some Airlines require 1-2 days advance booking

CHENNAI SEA PORT

  • In lieu of on going “Go-Slow” within the Chennai Port Terminals [CITPL, in particular] owing to ‘congestion like situation’, the port approach roads upto the point of ‘0’ Gate are occasionally congested. The container laden vehicles get stranded in the long queues, resulting delays in ‘entering the port terminals’ and subsequently, the unforeseen / unprecedented events / incidents like – containers being shut out by the Chennai port terminal operators as well as vessel operators alike, to maintain the “vessel’s productivity levels”. The productivity levels of EIR processing @ the port entry point, too have drastically dipped resulting in piling up of vehicles in the long queues outside ‘0’ Gate

TUTICORIN – SEA PORT

  • Please note that Tuticorin Port slowly coming under normal.  EIR process implemented thru online system i/o issuing manual carting order so it’s affecting last minutes direct loading containers.

CHENNAI Air

  • Air Port situation under Normal.
  • ETIHAD Cut down their freighter from weekly 3 to 2 (only Monday & Wednesday)  from Chennai.  This week QR also cut down the flight 3 to 2.
  • So all other carriers are going full and having some back log.

BANGLORE Air

  • Airport Situation Normal at this point in time.