North Major Ports
 
Air
Delhi Airport:

  • Currently no back log at New Delhi AIRPORT.
  • Most airlines are confirming space

Sea

  • AT ICD Loni:  Container takes 2-3 days for railing to Mumbai port
  • ICD FARIDABAD: Container takes 2-3 days for railing to Mumbai port
  • ICD TUGHLAKABAD (TKD): Container takes 1-2 days for railing to Mumbai port
  • CFS PATPARGANJ (PPG): Container takes 1-2 days for railing to Mumbai port
  • ICD DADRI: Container takes 1-2 days for railing to Mumbai port

Please note : Situation is normal at all CFS.
 
West Major Ports
 
Air
Mumbai Airport:

  • Currently no back log at Mumbai air terminal.
  • Most airlines are confirming space.

Sea
NHAVA SHEVA

  • Jawaharlal Nehru Port Trust ( JNPT): Slow
  • Nhava Sheva International Container Terminal (NSICT) : Slow
  • Gateway Terminals India Pvt Ltd (GTI) : Slow
  • CONCOR train inland haulage normal
  • Some vessels berthing earlier than scheduled, before port cut off
  • Colombo port is under congestion resulting in many connecting vessels not calling, containers are not getting loaded.

South Major Ports
 
Air
CHENNAI & BANGALORE

  • There are Heavy back log in Air Port Authority Shed with EK, QR, EY After clearance some carrier’s taking minimum 2 Days waiting in Chennai & Bangalore, especially Air India & Air France.
  • Volumetric cargo not accepting by carriers presently.  If accepting also onward connection is not getting properly.  
  • Air India having minimum 2 Days delay after handing over and uplifting from Chennai to Delhi
  • Week no. 28 QR operating 3 freighter WED/ FRI /SAT .
  • EK has STOPPED THE CARTING ORDER Due to their WAREHOUSE CONGESTION AT DXB. The mail received from Emirates is enclosed herewith.        

Sea
CHENNAI & TUTICORIN

  • CHENNAI: Normal
  • TUTICORIN: Normal …Due to Week 27 Mothervessel skipping from Colombo to Europe vessel, Expecting  heavy congestion & rollover for this week & next week from Colombo to Europe vessel consortium of (EVERGREEN/ HANJIN/NYK LINE )
  • Time being EVERGREEN is issuing the Carting Order for their Week no.31 mother vessel only.

Carrier’s are issuing the Inventory without any problem for Europe & USA.
Only Special Equipment having the problem like – OT/ FLAT RACK
 
No Vessel berthing delayed report from both Ports.
 
Some Delay’s there is in Railing from Chennai to Bangalore taking 2 Days after shifting the container from Port to Yard.